Where To Start Applying Asfalt Single To Your Roof
2 install the ridge shingles.
Where to start applying asfalt single to your roof. Do this on both sides of the roof. Use a starter strip or cut pieces for a starter course. Install new flashing metal flashing is often called drip edge along the. Starting at the left the other way is to begin at the far left edge of the roof and go across.
Rip cut the starter strip or starter pieces so that they butt up against the second course of existing shingles and are even with the front edge of the existing roofing. If you live in an area with inclement weather you should consider using a special ice and water protector. To lay out the design for the shingles begin at the bottom of the roof and place a tape measure inch from the edge of the roof to ensure the shingles overhang the drip edge. Attach with nails along the top edge of the strip.
Overlap each row at least 3 to 4 inches. Regardless of the asphalt shingle type or style you ve chosen the process is basically the same as mentioned earlier you start at the bottom and overlap as you work your way across and up the roof. Start by laying asphalt felt or other underlayment over the roof. The method you follow should depend on the specific directions from your shingle s manufacturer.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. Many pros shingle in a vertical line up the roof because it s much faster. Asphalt shingles are commonly used on sloped roofs single homes and smaller residential projects just to name a few. Using your staple gun secure the felt to the roof.
Carefully flash the valleys and seams. This material is very easy to install and provides flexibility during its installation process. Asphalt shingles are one of the least expensive roofing materials and they are available in a wide variety of colors. Bend single tabs or special ridge shingles over the ridge beginning at the end putting a bead of asphalt under the first ridge shingle to hold down the tab.
Nail it where the next ridge shingle will cover the nails about an inch horizontally and vertically. Where several workers are installing shingles one usually begins by installing shingles along the eave overhang while others begin filling in the field working from bottom to top.